斜跨曲线异形拱桥施工过程应力和挠度分析
杜闯12,丁红岩1,张浦阳1,傅玉勇3

(1. 天津大学建筑工程学院,天津 300072;2.河北工业大学土木工程学院,天津 300401;
3. 天津华厦建筑设计有限公司,天津 301600
)

摘 要: 异型拱桥造型新颖独特,但受力复杂。为了确保异型拱桥施工过程安全,以通泰大桥为工程实例,采用有限元软件Ansys建立三维有限元模型,考虑11种工况,进行异型拱桥的施工仿真分析。计算结果表明:主梁和拱肋的应力水平不高,主梁最大Mises应力为30.6 MPa,拱肋最大Mises应力为76.4 MPa,均未超出容许应力;吊索的最大应力为723 MPa,出现在工况4中B09号吊索,尽管也未超过容许应力,但应在施工中密切监控其受力。变形计算表明,成桥时(工况11)桥梁变形最大,为主梁变形,最大挠度值为21 cm。设计图纸中主梁设置了20 cm的预拱度,基本是可行的,与计算结果相符。

 

关键字: 施工过程;异型拱桥;应力;工况;有限元

Analysisof the stress and deflection of diagonal-span curve special shaped arch bridge during construction process
DU Chuang1,2, DING Hongyan1,ZHANG Puyang1,FU Yuyong3

1. School of Civil Engineering,Tianjin University,Tianjin 300072, China;
2. College of Civil Engineering, Hebei University of Technology, Tianjin 300401, China;
3. Tianjin Huaxia Building Design Co, Ltd, Tianjin 301600, China

Abstract:The special shaped arch bridge is unique in design and updated in style,but it is under complex stress state.In order to ensure safety during the construction process of special shape arch bridge, taking Tongtai bridge as the example, a three-dimensional finite element model was established by Ansys software in this paper.Considering eleven different load conditions,the numerical simulation was developed to analyze the whole construction process.It is shown that the stresses level of main girder and arch are not high;The maximum stresses are 30.6 MPa and 76.3 MPa in the main girder and arch, respectively,which are within the allowable stress;The maximum stress of slings is 723 MPa,which is the No. B09 sling at the No.4 load condition.Although the stress of slings does not exceed the allowable stress,it should be closely monitored the No. B09 sling during construction process. The calculation of deformation shows the maximum deformation occured when the bridge completes(at the No.11 load condition),it is the main girder and the deflection value is 21cm. The 20 cm of pre-camber setup of main girder in design drawings is feasible,which is consistent with the calculation results.

 

Key words: construction process; special shaped arch bridge; stress; load conditions; finite element

ISSN 1672-7029
CN 43-1423/U

主管:中华人民共和国教育部 主办:中南大学 中国铁道学会 承办:中南大学
湘ICP备09001153号 版权所有:《铁道科学与工程学报》编辑部
------------------------------------------------------------------------------------------
地 址:湖南省长沙市韶山南路22号 邮编:410075
电 话:0731-82655133,82656174   传真:0731-82655133   电子邮箱:jrse@mail.csu.edu.cn