宝兰客专泥岩隧道受力特性试验研究
张钦鹏1,2,梁庆国1,2,孟博文1,2,王新东3

(1.甘肃省道路桥梁与地下工程重点实验室,甘肃 兰州 730070;2.兰州交通大学 土木工程学院,甘肃 兰州 730070;3.中铁第一勘察设计院集团有限公司,陕西 西安 710043)

摘 要: 以宝兰客专上的安定泥岩隧道为工程背景,通过现场监测并结合室内相关土工试验,研究泥岩物理特性、围岩压力、钢拱架应力、初支与二衬接触压力、二衬钢筋轴力和混凝土应力等参数随时间变化的规律及空间分布特征。研究结果表明:安定隧道泥岩的膨胀性为无膨胀至弱膨胀,但泥岩遇水存在一定的崩解性。各测点围岩压力随时间增长,仰拱拱底的围岩压力最大,但最后都逐渐趋于稳定;钢拱架应力值不稳定,分布不均,波动较大,边墙墙脚处应力最大,但最终趋于稳定;初支与二衬接触压力总体较大,变化幅度较大,在边墙墙脚和拱顶处应力最大且随着时间增加最后趋于稳定值;二衬钢筋轴力均表现为压应力,内外层钢筋轴力变化趋势近似;混凝土应力普遍偏大,右拱脚处出现拉应力,左侧应力大于右侧应力。

 

关键字: 泥岩隧道;监控量测;围岩压力;钢拱架应力;软化

Test study on the mechanical characteristics of mudstone tunnel on Baoji-Lanzhou PDL
ZHANG Qinpeng1,2,LIANG Qingguo1,2,MENG Bowen1,2,WANG Xindong1,2

1.Key Laboratory of Road & Bridge and Underground Engineering of Gansu Province, Lanzhou 730070, China; 2.School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China; 3. China Railway First Survey & Design Institute Group Co., Ltd., Xi''an 710043, China

Abstract:Based on the engineering background of Anding mudstone tunnel on Baoji-Lanzhou Passenger Dedicated Lines, the physical properties of mudstone and the change over time and the distribution law of the parameters such as surrounding rock pressure, stress in steel arch, stress between the first linings and the second linings, steel axis force in the secondary lining, concrete stress, etc were studied through comprehensive on-site monitoring and geotechnical tests. The results show that the swelling property of mudstone ranges from no swelling to weak swelling, but there is a certain disintegration of mudstone with presence of water. The surrounding rock stress grows over time, the surrounding rock pressure of inverted arch is the maximum, which all tends to be stable in the end. The value of stress in steel arch is not stable, even with large fluctuation. The stress in steel arch of side wall foundation is also the maximum, however, it tends to be stable in the end. The stress between first linings and second linings is larger overall with large fluctuation, and the stress of side wall foundation is the maximum, increases over time and finally tends to be stable. The steel axis force in the secondary lining is compressive, the value in steel axis force of both inside and outside is approximate. Concrete stress is relatively generally large, where the stress in right arch springing appear to be tensile stress, and the stress in left arch springing are larger than those in the right side.

 

Key words: mudstone tunnel; monitoring measurement; surrounding rock pressure; stress in steel arch; soften

ISSN 1672-7029
CN 43-1423/U

主管:中华人民共和国教育部 主办:中南大学 中国铁道学会 承办:中南大学
湘ICP备09001153号 版权所有:《铁道科学与工程学报》编辑部
------------------------------------------------------------------------------------------
地 址:湖南省长沙市韶山南路22号 邮编:410075
电 话:0731-82655133,82656174   传真:0731-82655133   电子邮箱:jrse@mail.csu.edu.cn